• Skip to primary navigation
  • Skip to content

Collision Blast

Providing FREE Auto Body and Paint Training Videos

  • Home
  • Auto Body & Paint Supplies
    • Auto Paint Supplies
    • Restoration Tools and Supplies
    • POR 15 Supplies
    • Touch-up Paint
    • Wiper Blades
    • SunMight Sandpaper
    • Oil & Air Filters
  • Lessons, Projects…
  • Blog

Collision Repair Program at Baker College in Flint Up To A Challenge

January 20, 2011 by admin 2 Comments

I came across this video of Baker College’s Collision Repair program getting ready to perform a restoration job. However, it was not the car that caught my attention, it’s the facility. Check out how clean and the amount of space they have. I certainly that this program would be a college for our NATEF (ASE) accredited program list, but unfortunately, after checking, I could not confirm that the program is accredited. I still thought this was worth posting, due to the facility. The space, cleanliness, and painted floor really make this shop look great.

Are you a collision repair instructor or student? If you are, let’s hear about it. Let us know if you have videos or photos of it. We can post them and show it off for you. If you’re a NATEF accredited school and you have a video, we can post it in NATEF Schools list.

Filed Under: Body and Paint, Collision Repair News, Collision Repair Schools & Colleges Tagged With: auto body school, auto body training, autobody, baker college, collision repair facility, collision repair news, collision repair program, collision repair school, collision repair technology, collision repair training, flint, michigan, restoration, restore, rust repair, technical education

Introduction to Resistance Welding

November 4, 2010 by larrygoju 1 Comment


History

In simplest terms, welding is a process by which two or more pieces of metal are joined together by applying heat and pressure.  Back in history, blacksmiths and craftsmen would heat metals in a furnace and then weld them by hammering the red-hot metals together.  By hammering the metals as they cooled, the weld would be made stronger.  The heating and hammering method is known as forge welding.  While forge welding worked quite well for most of the welding done back then, today’s new advanced metals and welding requirements are a little more advanced.  Just imagine an automobile manufacture or collision repair facility using this process.

As time pasted and the requirements for more efficient welding methods were needed, engineers and those craftsman involved in welding were forced to invent better processes.  One such person was a professor and electrical engineer by the name of Elihu Thompson (Thompson-Houston Electric Co. which was purchased by General Electric Co in 1882).  In 1885 Professor Thompson invented a process called electric resistance welding, due to the need of heat control of the metal being welded.  At that time MIG/GMAW (Metal Inert Gas/Gas Metal Arc Welding) and Gas Welding were the most popular welding methods and both use filler wire and higher temperatures to complete a weld.  As time went on, Professor Thompson’s method progressed into what we know as today as Squeeze Type Resistance Spot Welding (STRSW) or the shortened version Resistance Spot Welding (RSW).  Today’s resistance welders work almost exactly on the same principles laid out by Professor Thompson.  Resistance welding method is so aptly named because it is the resistance between the contact surfaces of the metals being welded that generates the heat to fuse them together along with the pressure being applied.

Obtaining the best results for a proper RSW requires a thorough understanding of the materials being welded, control of the heat and pressure being applied at the weld point, the proper clamping, electrode tip maintenance and the amount of electrical current provided to the equipment.  On earlier STRSW equipment there were a lot of variables the technician need to adjust and fine tune, such as the weld current, squeeze time, weld time, hold time, electrode force (pressure), material thickness and surface condition and cleanliness of the materials being welded.  Fortunately for us today’s resistance spot welders have eliminated much of these adjustments, and even some do everything automatically.

Weld Cycle

There are three major processes to complete a RSW, they are Squeeze Time (Pressure), Weld Time (Current) and Hold Time (Cooling/Solidification).

1.     Squeeze Time (Pressure) – is when the electrodes come together and build up to a specified amount of force before the current (Weld Time) is applied.

2.     Weld Time (Current) – is when the current is actually passing through the work pieces (metal) and enough resistance is built up to create enough heat (2400°F) to melt the pieces together without filler wire, like the MIG/GMAW method.

3.     Hold Time (Cooling/Solidification) – While the electrode force (pressure) still being applied and the current has ceased (off), the weld nugget cools and the metals are forged under the force of the electrodes.  The electrode force continues to hold the work pieces together until the weld solidifies, cools and the weld nugget reaches its maximum strength.

Surprisingly this whole welding process takes approximately no longer than 3 to 5 seconds.  Just think how much time it takes to make a MIG/GMA weld and in some cases you still have to dress the weld and that is not necessary with STRSW.

Today’s STRSW

Today’s welders make welding easier and will make the technicians more efficient.  But why are we using the STRSW process? Many OEM’s are requiring their use in their specific repair procedures, such as Mercedes Benz, Audi and BMW to name a few, due the advanced steels being used.  Here are some of the advantages of STRSW; less heat affect zone (HAZ), less burn damage to adjacent panels, drilling holes is not required, replication of OEM weld appearance and strength, no dressing (grinding) required, no filler lens (welding helmet) required, simple to master and an almost undetectable repair.

Let’s look at some of the features of today’s welders.  After purchasing your STRSW you will want to start welding right away, but some practice and set up will be needed.  After having an electrician run the wiring and installing the proper receptacles (wall plugs/outlets) you will be ready to start practicing with your STRSW.  Due to the OEM requirements to weld today’s advanced high strength steels, it is recommended to purchase a 3phase inverter welding machine that is water cooled such as the ProSpot i4, Car-o-liner CR510 or CTR12000 Vision or the Elektron M100W.  3phase RSW usually require a 4 gauge wire, 60 amp breaker and 30 foot limit on the extension cord, make sure your electrician follows the proper equipment makers recommendations.  After installation read the equipment maker’s user manual and it is also recommended to take a formal course on STRSW, from I-CAR (WCS04), P&L’s RSW course or similar course to educate you about the process and operation of the RSW method.  Many of today’s machines will ask you to choose the type of substrate (type of steel) you will be welding, such as HSS/Galv (High Strength Steel/Galvanized), Mild Steel, Weld-Bond (using adhesives), Boron Steel, AHSS (Advanced High Strength Steel), Pulse Mode, OEM Specific Settings and even Custom Modes for your own preference.  The next step is to choose your material thickness, it is important to know if the setting is based on the total thickness or the total thickness divided by 2 (check with your manufacture).  The last step will be to set the inlet pressure of the machine; generally the starting point is 60psi and moving up to a maximum of 90psi.  Some STRSW, such as the Car-o-liner CTR12000 Vision, uses a sensor to automatically set the type of substrate, weld time and pressure settings basically eliminating technician error.

Welding procedures

The following is a general list of procedures to follow to ensure proper resistance welds after the replacement panel has been prepared for installation:

1.     Check the OEM replacement procedures to see what welds are required for each area of the panel being replaced and the mating flange preparation.  Some OEM’s require STRSW to be used on all flanges where the arms can access both sides of the flange and in areas inaccessibly utilizing MIG/GMAW plug welds.  Other OEM’s require Rivet-Bonding in areas inaccessible by the arms and no MIG/GMAW at all.  Some OEM’s require weld-bonding for installation of replacement panels.  (for OEM repair procedures check the OEM web site or www.ALLDATACollision.com)

2.     Set the machine settings (unless it is fully automatic like the CTR1200 Vision) to the OEM specifications and check that electrode tips are clean and in good condition.  Some machines have sharpeners to clean and reshape the tip, while others have replaceable electrode tips, which should be changed every job and charged for on the estimate.

3.     Now for the most important step, practice welds.  Cut some metal coupons (pieces) from the damaged or unused portion of the replacement part.  Set the coupons up exactly the same way the flanges are set up on the vehicle.  Clamp the together and weld.  After the coupons cool off (a minute or two), destructively test them by peeling them apart.  Measure the tear out hole, which needs to be 5x’ s the metal thickness of the thicker piece for a two layer flange weld and the middle thickness on a multiple layer flange.  After passing the visual and destructive test, take a photo of the coupons and attach the photos to the file and save the coupons for liability protection.  Now you are ready to weld.

Hopefully this article has brought to your attention the importance of the STRW process and the procedures to ensure a proper weld.  Look for a future article on Advanced Joining Techniques and Procedures.

Feel free to contact us at anytime if you have any questions that we could help with.

Larry Montanez, CDA is a former I-CAR Instructor, and is Co-Owner of P&L Consultants with Peter Pratti Jr. P&L Consultants work with collision repair shops on estimating, production, and proper repair procedures. P&L conducts repair workshops on MIG & Resistance Welding, Measuring for Estimating, Advanced Estimating Skills. P&L also conducts investigations for insurers and repair shops for improper repairs, collision reparability, and estimating issues.  P&L can be reached by contacting Larry at Office (718) 891 – 4018; Cell (917) 860 – 3588; Fax (718) 646 – 2733; E-mail larrygoju@aol.com.

Jeff Lange, PE, is president of Lange Technical Services, Ltd. of Deer Park, New York. www.LangeTech.net Jeff is a Licensed New York State Professional Engineer who specializes in investigating vehicle and component failures. Lange Technical Services, Ltd. is an investigative engineering firm performing forensic vehicle examinations and analysis for accident reconstruction, products liability and insurance issues.   Jeff can be reached at 631-667-6128 or by e-mail at Jeff.Lange@LangeTech.net.

Filed Under: Collision Repair News Tagged With: collision repair facility, gas metal arc welding, high strength steel, introduction to resistance welding, lange technical services, metals and welding, oem repair procedures, resistance spot welders, resistance spot welding, resistance welding

Volkswagen launches Certified Collision Repair Facility program – Washington Times

July 10, 2010 by admin Leave a Comment

Herndon, VA | Volkswagen has just launched a today VW-Certified Collision Repair Facility program for U.S. dealer-affiliated and independent body shops. This program provides VW-certification for collision repair facilities performing repairs in accordance with Volkswagen’s high safety standards and specifications. READ MORE via Volkswagen launches Certified Collision Repair Facility program – Washington Times.

Filed Under: Collision Repair News Tagged With: certified collision repair facility, collision repair, collision repair facilities, collision repair facility, launches certified collision, repair facility program, volkswagen launches certified collision repair facility program 8211 washington times, volkswagon vw-certified collision, VOLKSWAGON VW-CERTIFIED COLLISION REPAIR FACILITY, vw-certified collision repair

There is no letter (I) in the word team – working together in a lean working environment.

June 9, 2009 by Butler--BCRN Leave a Comment

I’ve been hearing about the collision industry going lean.  Therefore, I thought that I better check into the lean process to stay up with current trends and to determine what lean means for the collision industry. 

I’m still learning about this process, but I believe that we’ve been teaching some of the concepts already.  For instance, utilizing employees to produce higher results.  This is achieved by teaching team building activities.  I’ve always emphasized to work as a team, but it may become more important as many collision repair facilities go lean.  

Shops going lean are looking for team players that can work together in a systematic, simplistic, fast paced, working environment.  We’ll be discussing what that looks like for a collision repair facility in upcoming blog posts, as I learn more about the process myself.  

I don’t thing we can achieve full lean and six sigma status in an educational environment.  However, I think it’s important to address many of the principles.  We need to produce employees for traditional shops while teaching some of the current trends as well.  However, the idea of teamwork is a win/win for everyone.  I believe that these skills will work well for traditional and lean working environments. 

My favorite acronym for TEAM is this: Together Everyone Accomplishes More.  I believe this is one of the key ideas of lean…working together to improve each segment of a business. 

Lean and six sigma methods are not new, but incorporating them into a collision repair business are new to me.  Check back to explore and discover how these methods fit into the collision repair industry.  

If you’re knowledgeable about the lean or six sigma process, we’d love to hear and learn from you.  Leave us a comment.


Filed Under: Uncategorized Tagged With: collision repair, collision repair business, collision repair facilities, collision repair facility, collision repair industry, lean working environment, lean working environments, team building activities, there is no letter i in the word team 8211 working together in a lean working environment, working environment

  • Basic Training Course
  • Schools
  • Consumer
  • Interviews/Stories
  • Eastwood Series

Copyright © 2025 · Aspire Pro on Genesis Framework · WordPress · Log in